+
  • 12月10日.mp4
  • DSC_0052.JPG
  • DSC_0025.JPG
  • DSC_0028.JPG
  • DSC_0174.JPG
  • DSC_0145.JPG
  • DSC_0179.JPG
  • DSC_0170.JPG
  • DSC_0138.JPG
  • DSC_0154.JPG
  • DSC_0121.JPG
  • DSC_0129.JPG
  • DSC_0134.JPG
  • DSC_0131.JPG
  • DSC_0132.JPG

Fire command vehicle


Summary:

This fire command vehicle is modified based on a high-quality bus chassis. It is equipped with a series of safety configurations. For example, the braking system, steering system, seat belts and so on all adopt high-quality components to ensure the driving safety of the vehicle. Meanwhile, the vehicle is also equipped with warning systems, such as warning lights and sirens, which can effectively remind surrounding vehicles and pedestrians to make way during the driving process. The power supply system is stable, the equipment has strong compatibility, and the meteorological detection is accurate. Multiple surveillance cameras are installed, which can monitor the situation of the rescue site in all directions at 360 degrees. The interior space of the vehicle is reasonably laid out, with clear divisions of functional areas such as the command area, office area and rest area, providing a spacious and comfortable working and resting environment for commanders and rescuers. The vehicle's design fully takes into account humanized needs. For example, it is equipped with comfortable seats, air-conditioning systems, lighting systems, etc., which improves the working and living convenience of the people inside the vehicle.

Fire command vehicle

Details


Related Documents

Key:

Command and control fire vehicle

Fire command vehicle communication system

Multifunctional fire command vehicle

Prev

Military Emergency Command Vehicle

Releated Products


OEM/ODM

01

Sales consulting

Understand customer needs and determine the required products

02

Scheme design

Design drawings and make plans according to needs

03

Confirm the plan

Determine the details of the modification content according to the filter

04

Quotation

Determine the project and put it into production in strict accordance with the contract

05

Sign a contract

Determine the final price and production cycle and sign the contract terms

06

Production

According to the plan and modification list, reasonable quotation

Feedback

Leave a message in time to get your discount